File #: 293-2025    Version: 1 Name:
Type: Emergency Ordinance Status: Agenda Ready
File created: 2/27/2025 In control: Utilities Committee
On agenda: 4/3/2025 Final action:
Passage/adoption date:
Effective date:    
Title: AN EMERGENCY ORDINANCE Authorizing the purchase by one or more requirement contracts of materials, equipment, supplies, and services needed to repair, replace, and maintain the high-voltage static transmission pipe-type cable system components and for emergency oil spill cleanup, including labor and installation, if necessary, for the Division of Cleveland Public Power, Department of Public Utilities, for a period of two years, with two one-year options to renew, the first of which is exercisable through additional legislative authority.
Sponsors: Brian Kazy, Blaine A. Griffin, By Departmental Request
Indexes: CLEVELAND PUBLIC POWER, PROFESSIONAL SERVICES CONTRACTS, UTILITIES DEPARTMENT
Attachments: 1. 293-2025-Req k high Voltage static pipe system and emergency oil spill cleanup

Title

AN EMERGENCY ORDINANCE Authorizing the purchase by one or more requirement contracts of materials, equipment, supplies, and services needed to repair, replace, and maintain the high-voltage static transmission pipe-type cable system components and for emergency oil spill cleanup, including labor and installation, if necessary, for the Division of Cleveland Public Power, Department of Public Utilities, for a period of two years, with two one-year options to renew, the first of which is exercisable through additional legislative authority.