File #:
|
140-2019
Version:
1
|
Name:
|
|
Type:
|
Emergency Ordinance
|
Status:
|
Passed
|
On agenda:
|
3/11/2019
|
Final action:
|
3/4/2019
|
Passage/adoption date:
|
3/4/2019
|
|
|
Title:
|
AN EMERGENCY ORDINANCE Determining the method of making the public improvement of repairing, constructing, or installing, roadways, bus pads, sidewalks, driveway aprons, curbs, brick streets, ADA compliant curb ramps, minor bridge repairs, and appurtenances, and asphalt resurfacing and asphalt crack sealing; authorizing the Director of Capital Projects to enter into one or more public improvement requirement contracts for the making of the improvement; authorizing the director to apply for and accept any gifts or grants; and authorizing any agreements, for a period not to exceed two years.
|
Indexes:
|
CAPITAL PROJECTS, ENGINEERING AND CONSTRUCTION DIVISION, PUBLIC IMPROVEMENT CONTRACTS
|
Attachments:
|
1. 140-2019-cap-EOrd-PIK Req K right of ways roadways, sidewalks, bus pads, aprons, curbs, bridge, concrete, 2017-18 con (2), 2. 140-2019 Executive Summay, 3. 140-2019 map, 4. Ord. No. 140-2019 (Final)
|
Title
AN EMERGENCY ORDINANCE Determining the method of making the public improvement of repairing, constructing, or installing, roadways, bus pads, sidewalks, driveway aprons, curbs, brick streets, ADA compliant curb ramps, minor bridge repairs, and appurtenances, and asphalt resurfacing and asphalt crack sealing; authorizing the Director of Capital Projects to enter into one or more public improvement requirement contracts for the making of the improvement; authorizing the director to apply for and accept any gifts or grants; and authorizing any agreements, for a period not to exceed two years.
|